Author: United States. Army. Corps of Engineers. Alaska District
Publisher:
Published: 1978
Total Pages: 318
ISBN-13:
DOWNLOAD EBOOK →Plan of study presenting a program of activities for project feasibility analysis of hydroelectric development in the upper Susitna River basin in Alaska. Each activity is described along with a cost estimate for its completion.
Author:
Publisher:
Published: 1982
Total Pages:
ISBN-13:
DOWNLOAD EBOOK →A feasibility report to establish definitive project arrangements for Watana and Devil Canyon including associated transmission facilities, cost estimates, and an economic and financial evaluation for the Susitna Hydroelectric Project in Alaska, and to assess the environmental impact of the project and appropriate mitigation measures.
Author: Alaska Power Authority
Publisher:
Published: 1979
Total Pages: 172
ISBN-13:
DOWNLOAD EBOOK →"This environmental assessment is a systematic examination of the environmental impacts and of ways to minimize and mitigate adverse impacts of the proposed activities."--Page 1.1.
Author: Acres American Incorporated
Publisher:
Published: 1982
Total Pages: 66
ISBN-13:
DOWNLOAD EBOOK →A draft summary report of the Feasibility Study of the Susitna Hydroelectric Project proposed by the Alaska Power Authority and intended for the public at large and interested agencies and organizations.
Author: United States. Army. Corps of Engineers. Alaska District
Publisher:
Published: 1978
Total Pages: 63
ISBN-13:
DOWNLOAD EBOOK →Author: United States. Army. Corps of Engineers. Alaska District
Publisher:
Published: 1978
Total Pages: 64
ISBN-13:
DOWNLOAD EBOOK →"The function of this environmental assessment is to conduct a systematic and analytical assessment of the environmental impacts, including ways to minimize adverse impacts, related to the field activities of the project feasibility analysis as detailed in the June 1978 'Plan of Study for Susitna Feasibility Analysis.' This project feasibility will consist of engineering, economic, social, and biological studies which are considered necessary to establish the feasibility of developing the upper Susitna hydropower potential."--Page [1].
Author: Susitna Hydroelectric Project. External Review Panel. Meeting on Staged Construction
Publisher:
Published: 1985
Total Pages: 120
ISBN-13:
DOWNLOAD EBOOK →This document represents a meeting presentation. It outlines construction details on the Watana Dam and Devil Canyon Dam, required and planned activities, and updated information on the Susitna Hydroelectric Project, and contains short reports, charts, maps, and technical drawings.
Author: Alaska Energy Authority
Publisher:
Published: 2011
Total Pages:
ISBN-13:
DOWNLOAD EBOOK →The Alaska Energy Authority is filing this Notice of Intent and Pre-Application Document with the Federal Energy Regulatory Commission for an original license for the Susitna-Watana Hydroelectric Project, FERC no. 14241. As proposed, the Project would include construction of a dam, reservoir, and power plant on the Susitna River starting at river mile 184, approximately 34 miles upstream of Devils Canyon. Transmission lines connecting into the existing Railbelt transmission system and an access road would also be constructed. The FERC License Application is scheduled for filing on or about September 2015. This document is primarily a description of the project. A small section (Section 5) reviews issues at stake and studies to be conducted.