Tampa Electric Company, Polk Power Station Unit No. 1, Preliminary Public Design Report

Tampa Electric Company, Polk Power Station Unit No. 1, Preliminary Public Design Report PDF

Author:

Publisher:

Published: 1994

Total Pages: 146

ISBN-13:

DOWNLOAD EBOOK →

This preliminary Public Design Report (PDR) provides design information about Tampa Electric Company's Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. This project is partially funded by the US Department of Energy (DOE) under Round III of its Clean Coal Technology (CCT) Program under the provisions of Cooperative Agreement between DOE and Tampa Electric Company, novated on March 5,1992. The project is highlighted by the inclusion of a new hot gas cleanup system. DOE's project management is based at its Morgantown Energy Technology Center (METC) in West Virginia. This report is preliminary, and the information contained herein is subject to revision. Definitive information will be available in the final PDR, which will be published at the completion of detailed engineering.

Reaching an Agreement to Build a New Coal-fired Power Plant Near a National Park by Mitigating Potential Environmental Impacts

Reaching an Agreement to Build a New Coal-fired Power Plant Near a National Park by Mitigating Potential Environmental Impacts PDF

Author:

Publisher:

Published: 1994

Total Pages: 9

ISBN-13:

DOWNLOAD EBOOK →

This paper presents an interesting example of compromise through comprehensive environmental analysis and intensive negotiation to build a coal-fired power plant near an environmentally sensitive area. In December 1993, the US Department of Energy (DOE) completed the final environmental impact statement (EIS) for the Healy clean Coal Project (HCCP), a proposed demonstration project that would be cost- shared by DOE and the Alaska Industrial Development and Export Authority (AIDEA). The HCCP would be built adjacent to the existing coal-fired Golden Valley Electric Association, Inc. (GVEA) Unit No. 1 in Healy, Alaska, about 4 miles north of Denali National Park and Preserve (DNPP). In response to US Department of the Interior (DOI) concerns about potential air quality related impacts on DNPP, DOE facilitated negotiations among DOE, AIDEA, and GVEA which overcame a ''stalemate'' situation. A Memorandum of Agreement was signed by all four parties, enabling DOI to withdraw its objections. The cornerstone of the Agreement is the planned retrofit of Unit No. 1 to reduce emissions of sulfur dioxide and oxides of nitrogen. If the demonstration technologies operate as expected, combined emissions from the Healy site would increase by only about 8% but electrical generation would triple. The Agreement is a ''win/win'' outcome: DOE can demonstrate the new technologies, AIDEA can build a new power plant for GVEA to operate, and DOE can safeguard the pristine environment DNPP.