From Dream to Reality: Scaling the Construction Planning Hurdles of a Megaproject

From Dream to Reality: Scaling the Construction Planning Hurdles of a Megaproject PDF

Author: Orikaye Brown-West

Publisher: Lulu.com

Published: 2008-11-10

Total Pages: 237

ISBN-13: 055700747X

DOWNLOAD EBOOK →

Discusses how the dream of a megaproject is realized, elucidates the various demands, and explains why it takes years to materialize. It asserts that a megaproject is any project that requires a great deal of management courage, capital, patience, and well-conceived plans. And that managing a megaproject is more than managing a major construction effort; it is also managing a public responsibility with the concomitant management accountability and transparency. It advances the Big Dig as the case study megaproject of record, because none of the other notable megaprojects in the 20th century can boast the paradoxes and the lessons that the Big Dig provides. It affirms that leadership engagement, imagination, and political alignment, facilitate the realization of such dream. It espouses good planning and invokes foresight considerations as a sine qua non for getting the right strategic gaps closed, the misdeeds avoided and the right mechanics applied for a successful project outcome.

In DEFENSE of the BIG DIG: How Politics Affected the Planning, Design and Construction of the Boston Central Artery/Tunnel Project

In DEFENSE of the BIG DIG: How Politics Affected the Planning, Design and Construction of the Boston Central Artery/Tunnel Project PDF

Author: Orikaye G. Brown-West

Publisher: Lulu.com

Published: 2008-09-06

Total Pages: 283

ISBN-13: 1430312653

DOWNLOAD EBOOK →

Tells the story of the planning, design and construction of the Big Dig, Boston's Central Artery and Tunnel project from a personal perspective. This most complex and technologically challenging project is a paradox of praises and blame. This book defends the professionals who planned, designed and constructed it; and blames the politics of project planning for the shortcomings.

Completing the "Big Dig"

Completing the

Author: Transportation Research Board

Publisher: National Academies Press

Published: 2003-03-21

Total Pages: 60

ISBN-13: 0309088879

DOWNLOAD EBOOK →

Boston's Central Artery/Tunnel Project, a 7.8 mile system of bridges and underground highways and ramps, is the most expensive public works project ever undertaken in the United States. The original cost estimate of $2.6 billion has already been exceeded by $12 billion, and the project will not be completed until 2005, seven years late. The Massachusetts Turnpike Authority (MTA), the public steward of the project, requested that the National Research Council carry out an independent assessment of the project's management and contract administration practices, with a focus on the present situation and measures that should be taken to bring the project to a successful conclusion. This report presents the committee's findings and recommendations pertaining to cost, scheduling, and transitioning from the current organization dominated by consultants to an operations organization composed largely of full-time MTA staff. The report recommends that MTA establish an external, independent, peer-review program to address technical and management issues until the transition to operations and maintenance is complete; begin a media campaign now to teach drivers how to use the new system safely; and develop, immediately implement, and maintain a comprehensive security program.

The Big Dig

The Big Dig PDF

Author: Peter Vanderwarker

Publisher: Little Brown & Company

Published: 2001

Total Pages: 56

ISBN-13: 9780316605984

DOWNLOAD EBOOK →

Describes the development of the city of Boston and the reasons for creating the Central Artery/Third Harbor Tunnel Project--known as "the big dig"--and outlines each step in its planning and construction.

Completing the "Big Dig"

Completing the

Author: National Research Council (U.S.). Board on Infrastructure and the Constructed Environment

Publisher: National Academy Press

Published: 2003

Total Pages: 49

ISBN-13: 9780309086899

DOWNLOAD EBOOK →

Boston's Central Artery/Tunnel Project, a 7.8 mile system of bridges and underground highways and ramps, is the most expensive public works project ever undertaken in the United States. The original cost estimate of $2.6 billion has already been exceeded by $12 billion, and the project will not be completed until 2005, seven years late. The Massachusetts Turnpike Authority (MTA), the public steward of the project, requested that the National Research Council carry out an independent assessment of the project's management and contract administration practices, with a focus on the present situation and measures that should be taken to bring the project to a successful conclusion. This report presents the committee's findings and recommendations pertaining to cost, scheduling, and transitioning from the current organization dominated by consultants to an operations organization composed largely of full-time MTA staff. The report recommends that MTA establish an external, independent, peer-review program to address technical and management issues until the transition to operations and maintenance is complete; begin a media campaign now to teach drivers how to use the new system safely; and develop, immediately implement, and maintain a comprehensive security program.

Segregation by Design

Segregation by Design PDF

Author: Catalina Freixas

Publisher: Springer

Published: 2018-10-24

Total Pages: 621

ISBN-13: 331972956X

DOWNLOAD EBOOK →

This book discusses racial segregation in American cities. Using St. Louis as a point of departure, it examines the causes and consequences of residential segregation, and proposes potential mitigation strategies. While an introduction, timeline and historical overview frame the subject, nine topic-specific conversations – between invited academics, policy makers and urban professionals – provide the main structure. Each of these conversations is contextualized by a photograph, an editors’ note and an essay written by a respected current or former St. Louisan. The essayists respond to the conversations by speaking to the impacts of segregation and by suggesting innovative policy and design tactics from their professional or academic perspective. The purpose of the book, therefore, is not to provide original research on residential segregation, but rather to offer a unique collection of insightful, transdisciplinary reflections on the experience of segregation in America and how it might be addressed.

Public Works

Public Works PDF

Author: Jeannie Meejin Yoon

Publisher:

Published: 2008

Total Pages: 196

ISBN-13:

DOWNLOAD EBOOK →

Edited by J. Meejin Yoon, Meredith Miller.

Policy and Planning for Large Infrastructure Projects

Policy and Planning for Large Infrastructure Projects PDF

Author: Bent Flyvbjerg

Publisher: World Bank Publications

Published: 2005

Total Pages: 32

ISBN-13:

DOWNLOAD EBOOK →

Abstract: "This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation is massive cost overruns, benefit shortfalls, and waste. Second, the paper explores the causes of misinformation and finds that political-economic explanations best account for the available evidence: planners and promoters deliberately misrepresent costs, benefits, and risks in order to increase the likelihood that it is their projects, and not the competition's, that gain approval and funding. This results in the "survival of the unfittest," where often it is not the best projects that are built, but the most misrepresented ones. Finally, the paper presents measures for reforming policy and planning for large infrastructure projects, with a focus on better planning methods and changed governance structures, the latter being more important."--World Bank web site.

Federal Task Force on the Boston Central Artery Tunnel Project

Federal Task Force on the Boston Central Artery Tunnel Project PDF

Author: U. S. Government

Publisher:

Published: 2000-03-01

Total Pages: 52

ISBN-13: 9781468004120

DOWNLOAD EBOOK →

The Federal Government's role in the Central Artery/Tunnel (CA/T) Project is one of oversight. Costing billions of Federal and State dollars, the CA/T Project is often referred to as "the largest public works project in American history." More Federal funding-$5.8 billion and growing-has been allocated to the CA/T Project than to any other construction project of its kind. As stewards of these tax dollars, the Federal Highway Administration (FHWA) is responsible for ensuring Federal funds are used responsibly and lawfully. To fulfill this fiduciary duty to the American people, the FHWA is governed by many statutes, regulations, and policies. As made clear by these legislative and administrative directives, the FHWA's oversight role is intended to be independent of the State's management of the Project. The FHWA Division Office is expected to evaluate critically the State's programs and provide technical assistance as needed. The FHWA has a long history of relying on a strong Federal/State partnership in carrying out its oversight role. Begun at the start of the Federal-aid highway program in 1916, the concept of a "partnership" reflects the FHWA's unique oversight approach to State transportation departments, whereby relationships are based on mutual trust, fairness, respect, cooperation, and communication. Although the FHWA makes Federal-aid highway funds available to the States, each State is responsible for managing and developing its projects, subject to Federal oversight. In the case of the CA/T Project, the FHWA's long history of strong Federal/State partnerships failed. On the one hand, the FHWA failed to maintain an independent enough relationship with the State to adequately fulfill its oversight role. On the other hand, the State breached its trust with the FHWA and others by intentionally withholding knowledge of the Project's potential cost overrun. In October 1999, the CA/T Project Director began a "bottom-up" review of all construction contracts to identify all future cost exposures on a contract by contract basis. The CA/T Project undertook this comprehensive cost review out of concern that costs would substantially exceed the $10.8 billion cost referred to repeatedly by Project managers in recent years. Although the FHWA Division Office did not receive complete information from the CA/T Project, it had received a draft of the U.S. Department of Transportation's Office of Inspector General (OIG) report dated October 7, 1999. In that draft, the OIG pointed out that the Project was experiencing significant construction cost increases, and if the trends continued the Project could need up to $942 million more in offsets or additional funding. The OIG draft report also pointed out that the Project's 1998 Finance Plan did not disclose significant cost information about the Project, such as construction cost increases or that contract awards were exceeding budget. These warnings should have caused the Division Office to scrutinize the information being provided by the Project more closely. However, the Division Office chose instead to continue to rely on assertions from the State that future cost increases were unlikely. Had FHWA independently reviewed the data provided by the OIG, it most likely would not have approved the finance plan presented by the CA/T Project in January 2000. On January 7, 2000, the Director of the CA/T Project submitted to the FHWA Massachusetts Division Office an "Annual Finance Plan" (Plan) that had been due in October 1999. According to Title 23, United States Code, Section 106, the Plan must provide a detailed estimate of the "cost to complete" the remaining elements of the CA/T Project, including reasonable assumptions of future cost increases. There was no indication in this Plan of a potential cost overrun.