Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF

Author: Ronald O'Rourke

Publisher: DIANE Publishing

Published: 2010-03

Total Pages: 43

ISBN-13: 1437919596

DOWNLOAD EBOOK →

Discusses the U.S. Navy¿s proposed FY 2010 budget requests funding for eight new Navy ships. This total includes two relatively expensive, high-capability combatant ships (a Virginia-class attack submarine and a DDG-51 class Aegis destroyer) and six relatively inexpensive ships (three Littoral Combat Ships [LCSs], two TAKE-1 auxiliary dry cargo ships, and one Joint High Speed Vessel [JHSV]). Concerns about the Navy¿s prospective ability to afford its long-range shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to concerns about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. Illus.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF

Author: Ronald O'Rourke

Publisher:

Published: 2020-11-14

Total Pages: 145

ISBN-13:

DOWNLOAD EBOOK →

Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.

Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF

Author: Congressional Service

Publisher: Createspace Independent Publishing Platform

Published: 2018-07-18

Total Pages: 106

ISBN-13: 9781723254611

DOWNLOAD EBOOK →

The Navy's goal for achieving and maintaining a fleet of 355 ships, released in December 2016, is 47 ships higher than the Navy's previous force-level goal of 308 ships. The force level of 355 ships is a goal to be attained in the future; the actual size of the Navy in recent years has generally been between 270 and 290 ships. Section 1025 of the FY2018 National Defense Authorization Act (H.R. 2810/P.L. 115-91 of December 12, 2017) states in part: "It shall be the policy of the United States to have available, as soon as practicable, not fewer than 355 battle force ships, comprised of the optimal mix of platforms, with funding subject to the availability of appropriations or other funds." Although the 355-ship force-level goal is 47 ships higher than the previous 308-ship force-level goal, achieving and maintaining the 355-ship fleet within 30 years would require adding more than 47 ships to the Navy's previous (FY2017) 30-year shipbuilding plan, in part because that plan did not include enough ships to fully achieve all elements of the 308-ship force-level goal. CRS estimated in 2017 that 57 to 67 ships would need to be added to the Navy's FY2017 30-year shipbuilding plan to achieve the Navy's 355-ship fleet and maintain it through the end of the 30-year period (i.e., through FY2046), unless the Navy extends the service lives of existing ships beyond currently planned figures and/or reactivates recently retired ships. Similarly, the Congressional Budget Office (CBO) estimated in 2017 that 73 to 77 ships would need to be added to a CBO-created notional version of the Navy's FY2018 30-year (FY2018-FY2047) shipbuilding plan to achieve the Navy's 355-ship fleet and maintain it not only through the end of the 30-year period (i.e., through FY2047), but another 10 years beyond the end of the 30-year period (i.e., through FY2057), unless the Navy extends the service lives of existing ships beyond currently planned figures and/or reactivates recently retired ships. Consistent with these CRS and CBO estimates, the Navy projects that the 47 additional ships included in the Navy's FY2019 30-year shipbuilding plan would not be enough the achieve a 355-ship fleet during the 30-year period. The Navy projects that if the FY2019 30-year shipbuilding plan were implemented, the fleet would peak at 342 ships in FY2039 and FY2041, and then drop to 335 ships by the end of the 30-year period. The Navy projects that under the FY2019 30-year shipbuilding plan, a 355-ship fleet would not be attained until the 2050s (and the aircraft carrier force-level goal within the 355-ship goal would not be attained until the 2060s). Consistent with CRS and CBO estimates from 2017, the Navy estimates that adding another 20 to 25 ships to the earlier years of the Navy's FY2019 30-year shipbuilding plan (and thus procuring a total of 321 to 326 ships in the 30-year plan, or 67 to 72 ships more than the 254 included in the FY2017 30-year plan) could accelerate the attainment of a 355-ship fleet to about 2036 or 2037. Additional shipbuilding funds are only a fraction of the total costs that would be needed to achieve and maintain the Navy's 355-ship fleet instead of the previously envisaged 308-ship fleet. CBO estimated in 2017 that, adding together both shipbuilding costs and ship operation and support (O&S) costs, the Navy's 355-ship fleet would cost an average of about $11 billion to $23 billion more per year in constant FY2017 dollars than the previously envisaged 308-ship fleet. This figure does not include additional costs for manned aircraft, unmanned systems, and weapons. Depending on total levels of defense spending in coming years, achieving and maintaining a 355-ship fleet could require reducing funding levels for other Department of Defense (DOD) programs.

Analysis of the Navy's Fiscal Year Shipbuilding Plan

Analysis of the Navy's Fiscal Year Shipbuilding Plan PDF

Author: Eric J. Labs

Publisher:

Published: 2013-11-23

Total Pages: 35

ISBN-13: 9781457849633

DOWNLOAD EBOOK →

The Dept. of Defense (DoD) generally issues annual reports that describe its plan for building new ships over the next 30 years. DoD submitted its 2014 shipbuilding plan to the Congress in May 2013, covering FY 2014 to 2043. This plan reflects the Navy's most recent goals for battle force ships -- goals that were developed in 2012 and outlined in a report to the Congress in Jan. 2013; that analysis is hereafter referred to as the 2012 force structure assessment. The goals developed in 2012 were slightly different from the ones that were outlined in the 2005 force structure assessment and were reflected in the Navy's shipbuilding plans up through last year. This report examined the 2014 plan in detail and estimated the costs of the proposed ship purchases using its own estimating methods and assumptions. It also analyzed how those ship purchases would affect the Navy's inventories of various types of ships over the next three decades. Tables and figures. This is a print on demand report.