DOD Needs to Provide More Credible Weapon Systems Cost Estimates to the Congress
Author: United States. General Accounting Office
Publisher:
Published: 1984
Total Pages: 132
ISBN-13:
DOWNLOAD EBOOK →Author: United States. General Accounting Office
Publisher:
Published: 1984
Total Pages: 132
ISBN-13:
DOWNLOAD EBOOK →Author: United States Accounting Office (GAO)
Publisher: Createspace Independent Publishing Platform
Published: 2018-05-19
Total Pages: 132
ISBN-13: 9781719289214
DOWNLOAD EBOOK →DOD Needs To Provide More Credible Weapon Systems Cost Estimates to the Congress
Author: United States. General Accounting Office
Publisher:
Published: 1984
Total Pages: 3
ISBN-13:
DOWNLOAD EBOOK →Author: United States. Government Accountability Office
Publisher:
Published: 2012
Total Pages: 43
ISBN-13:
DOWNLOAD EBOOK →With the nation facing fiscal challenges and the potential for tighter defense budgets, Congress and the Department of Defense (DOD) have placed more attention on controlling the billions of dollars spent annually on weapon system operating and support (O & S) costs. These costs include, costs for repair parts, maintenance, and personnel, and account for about 70 percent of the total costs of a weapon system over its life cycle. The selected acquisition report (SAR) is DOD's key recurring status report on the cost, schedule, and performance of major defense acquisition programs and is intended to provide authoritative information for congressional oversight of these programs. Oversight of O & S costs is important because many of the key decisions affecting these life-cycle costs are made during the acquisition process. GAO reviewed weapon system O & S cost estimates that DOD submits in the SAR. Specifically, GAO determined the extent to which the SARs provide consistent and reliable O & S cost estimate information that enables effective oversight of these weapon system costs. To conduct its review, GAO analyzed SAR data for 84 major systems that submitted O & S cost estimates in the 2010 SAR and selected a nonprobability sample of 15 systems for more in-depth review. To enhance visibility of weapon system O & S costs during acquisition, GAO recommends that DOD improve its guidance to program offices on cost reporting and also improve its process for reviewing these costs prior to final submission of the SAR to Congress. DOD concurred with GAO's recommendations.
Author: U.s. Government Accountability Office
Publisher: Createspace Independent Publishing Platform
Published: 2017-08-10
Total Pages: 74
ISBN-13: 9781974410927
DOWNLOAD EBOOK →"The Department of Defense (DOD) spends billions of dollars each year to sustain its weapon systems. These operating and support (O&S) costs can account for a significant portion of a system's total life-cycle costs and include costs for repair parts, maintenance, and personnel. The Weapon Systems Acquisition Reform Act of 2009 directs GAO to review the growth in O&S costs of major systems. GAO's report addresses (1) the extent to which life-cycle O&S cost estimates developed during acquisition and actual O&S costs are available for program management and decision making; (2) the extent to which DOD uses life-cycle O&S cost estimates after systems are fielded to quantify cost growth and identify its causes; and (3) the efforts taken by DOD to reduce O&S costs for major systems. GAO selected seven aviation systems that reflected varied characteristics and have been fielded at least several years. These systems were the F/A-18E/F, F-22A, B-1B, F-15E, AH-64D, CH-47D, and UH-60L. "
Author: United States. Government Accountability Office
Publisher: DIANE Publishing
Published: 2010
Total Pages: 73
ISBN-13: 1437936547
DOWNLOAD EBOOK →Report examining growth in operating and support (O&S) costs of major DOD weapons systems, and identifying measures to improve DOD ability to manage and reduce O&S costs of weapons systems over their life cycle.
Author: Michael J. Sullivan
Publisher: DIANE Publishing
Published: 2009-08
Total Pages: 25
ISBN-13: 1437915183
DOWNLOAD EBOOK →A broad consensus exists that weapon system problems are serious, but efforts at reform have had limited impact. Last year, it was reported that DoD's portfolio of weapon programs experienced cost growth of $295 billion from first estimates, were delayed by an average of 21 months, and delivered fewer quantities and capabilities to the war-fighter than originally planned. This testimony describes the systemic problems that contribute to the cost, schedule, and performance problems in weapon system programs, recent actions that DoD has taken to address these problems, proposed reform legislation that has recently been introduced, and additional steps needed to improve future performance of acquisition programs. Charts and tables.
Author: Department Of Defense
Publisher: Independently Published
Published: 2019-01-19
Total Pages: 108
ISBN-13: 9781794441101
DOWNLOAD EBOOK →2019 Missile Defense Review - January 2019 According to a senior administration official, a number of new technologies are highlighted in the report. The review looks at "the comprehensive environment the United States faces, and our allies and partners face. It does posture forces to be prepared for capabilities that currently exist and that we anticipate in the future." The report calls for major investments from both new technologies and existing systems. This is a very important and insightful report because many of the cost assessments for these technologies in the past, which concluded they were too expensive, are no longer applicable. Why buy a book you can download for free? We print this book so you don't have to. First you gotta find a good clean (legible) copy and make sure it's the latest version (not always easy). Some documents found on the web are missing some pages or the image quality is so poor, they are difficult to read. We look over each document carefully and replace poor quality images by going back to the original source document. We proof each document to make sure it's all there - including all changes. If you find a good copy, you could print it using a network printer you share with 100 other people (typically its either out of paper or toner). If it's just a 10-page document, no problem, but if it's 250-pages, you will need to punch 3 holes in all those pages and put it in a 3-ring binder. Takes at least an hour. It's much more cost-effective to just order the latest version from Amazon.com This book includes original commentary which is copyright material. Note that government documents are in the public domain. We print these large documents as a service so you don't have to. The books are compact, tightly-bound, full-size (8 1/2 by 11 inches), with large text and glossy covers. 4th Watch Publishing Co. is a HUBZONE SDVOSB. https: //usgovpub.com
Author: United States. General Accounting Office
Publisher:
Published: 1990
Total Pages: 80
ISBN-13:
DOWNLOAD EBOOK →Author: United States. Congress. Senate. Committee on Governmental Affairs
Publisher:
Published: 1983
Total Pages: 160
ISBN-13:
DOWNLOAD EBOOK →