Feasibility Report

Feasibility Report PDF

Author:

Publisher:

Published: 2003

Total Pages:

ISBN-13:

DOWNLOAD EBOOK →

The feasibility report is submitted for the development of expanded landfill capacity for construction and demolition waste at the "excess to mission" designated Badger Army Ammunition Plant. The buildings that pose safety hazards for civilian owners will be disassembled and the waste materials put into this landfill.