Publications Combined: Army Combat Fitness Test (ACFT) Training Guide, Handbook, Equipment List, Field Testing Manual & More

Publications Combined: Army Combat Fitness Test (ACFT) Training Guide, Handbook, Equipment List, Field Testing Manual & More PDF

Author:

Publisher: Jeffrey Frank Jones

Published: 2019-03-05

Total Pages: 604

ISBN-13:

DOWNLOAD EBOOK →

Over 600 total pages ... CONTENTS: Army Combat Fitness Test Training Guide Version 1.2 FIELD TESTING MANUAL Army Combat Fitness Test Version 1.4 Army Combat Fitness Test CALL NO. 18-37, September 2018 FM 7-22 ARMY PHYSICAL READINESS TRAINING, October 2012 IOC TESTING - ACFT EQUIPMENT LIST (1 X LANE REQUIREMENT) Version 1.1, 4 September 2018 ACFT Field Test Highlight Poster (Final) OVERVIEW: The Army will replace the Army Physical Fitness Test (APFT) with the Army Combat Fitness Test (ACFT) as the physical fitness test of record beginning in FY21. To accomplish this, the ACFT will be implemented in three phases. Phase 1 (Initial Operating Capability – IOC) includes a limited user Field Test with approximately 60 battalion-sized units from across all components of the Army. While the ACFT is backed by thorough scientific research and has undergone several revisions, there are still details that have not been finalized. The ACFT requires a testing site with a two-mile run course and a flat field space approximately 40 x 40 meters. The field space should be grass (well maintained and cut) or artificial turf that is generally flat and free of debris. While maintaining testing standards and requirements, commanders will make adjustments for local conditions when necessary. The start and finish point for the two-mile run course must be in close proximity to the Leg Tuck station. When test events are conducted indoors, the surface must be artificial turf only. Wood and rubberized surfaces are not authorized as they impact the speed of the Sprint-Drag-Carry. When environmental conditions prohibit outdoor testing, an indoor track may be used for the 2 Mile Run. The Test OIC or NCOIC are responsible to inspect and certify the site and determine the number of testing lanes. There should not be more than 4 Soldiers per testing group for the SPT, HRP, and SDC. The OIC or NCOIC must add additional lanes or move Soldiers to a later testing session to ensure no more than 4 Soldiers per testing group. Concerns related to Soldiers, graders, or commanders will be addressed prior to test day. The number of lanes varies by number of Soldiers testing. A 16-lane ACFT site will have the following: ACFT specific test equipment requirements: 16 hexagon/trap bars (60 pounds), each with a set of locking collars. While all NSN approved hexagon bars must weigh 60 pounds, there is always a small manufacturer’s production tolerance.The approved weight tolerance for the hexagon bar is + 2 pounds (58-62 pounds). Weight tolerance for the hexagon bar and therefore the 3 Repetition Maximum Deadlift does not include the collars. On average hexagon bar collars weigh < 2.0 pounds per pair and are considered incidental to the totalweight of the MDL weight. Approximately 3,000 lbs. of bumper plates. 16 x 10 lb. medicine ball 16 x nylon sled with pull straps. 32 x 40 lb. kettle bells. Permanent or mobile pull up bars (16 x pull-up bars at approximately 7.5 feet off the ground with,step-ups for shorter Soldiers). Common unit equipment for set-up and grading: 16 stop watches. 8 x 25m tape measures. 8 x wooden or PVC marking sticks for the SPT. One stick for every two lanes. 70 x 18” traffic cones. 50 field / dome cones. A soft, flat, dry test area approximately 40m x 40m on grass or artificial turf (half of a soccer or football field). A site that is free of any significant hazards. A preparation area (can be same as briefing area) to conduct Preparation Drill. A generally flat, measured running course with a solid, improved surface that is not more than 3 percent uphill grade and has no overall decline (start and finish must be at the same altitude).

Stinger Missile Publications Combined: Manportable Air Defense (MANPAD) Technical And Doctrinal History From 1980 To 2018

Stinger Missile Publications Combined: Manportable Air Defense (MANPAD) Technical And Doctrinal History From 1980 To 2018 PDF

Author: U.S. Army

Publisher: Jeffrey Frank Jones

Published:

Total Pages: 2850

ISBN-13:

DOWNLOAD EBOOK →

Over 2,800 total pages ... INTRODUCTION Today’s operational environment presents threats the Army has not faced in nearly 20 years. Against peer competitors, the joint force may face air parity or even localized enemy air overmatch, challenging the assumption of air superiority the joint force has held since the Korean War. This will make maneuver forces vulnerable to air attack by fixed- and rotary-wing aircraft, unmanned aircraft systems, and cruise missiles. Maneuver forces lack capacity and capability to address these threats and the Army requires a speedy response. Stinger missiles provide a key capability for maneuver forces to defend themselves from aerial observation and attack. However, without direct involvement from senior brigade combat team leaders and effective leader training, these missiles will become dead weight at best or a fratricide in waiting at worst. Units must plan effectively to utilize this capability and ensure it ties directly to their scheme of maneuver as opposed to simply task-organizing one Stinger team per company. Just a SAMPLE of the CONTENTS CALL HANDBOOK NO. 18-16 Maneuver Leader’s Guide to Stinger - Lessons and Best Practices (2018) INTRODUCTION TO MANPORTABLE (Stinger) AIR DEFENSE WEAPON SYSTEM - SUBCOURSE NO. AD 0575 (no date) FM 3-23.25 SHOULDER-LAUNCHED MUNITIONS (2006) FM 10-550/TO 13C7-22-71 AIRDROP OF SUPPLIES AND EQUIPMENT: RIGGING STINGER WEAPON SYSTEMS AND MISSILES (2000) FM 44-18-1 STINGER TEAM OPERATIONS (1984) FM 3-01.11 (FM 44-100-2) AIR DEFENSE ARTILLERY REFERENCE HANDBOOK (2000) MCRP 3-25.10A Low Altitude Air Defense (LAAD) Gunner’s Handbook (2011) TM 9-1425-429-12 OPERATOR'S AND ORGANIZATIONAL MAINTENANCE MANUAL: STINGER GUIDED MISSILE SYSTEM (1980) TM 9-1425-429-12-HR HAND RECEIPT MANUAL COVERING SYSTEM COMPONENTS OF END ITEM (COEI) BASIC ISSUE ITEMS (BII), AND ADDITIONAL AUTHORIZATION LIST (AAL) FOR STINGER AIR DEFENSE GUIDED MISSILE SYSTEM, STINGER TRAINING SET GUIDED MISSILE SYSTEM M134, COOLANT RECHARGING UNIT TRAINING SYSTEM M80, AND BATTERY CHARGER PP-7309/T (1983) TM 55-1425-429-14 TECHNICAL MANUAL TRANSPORTABILITY GUIDANCE STINGER WEAPON SYSTEM (1981) TM 9-1265-209-10 TECHNICAL MANUAL OPERATOR’S MANUAL FOR MULTIPLE INTEGRATED LASER ENGAGEMENT SYSTEM (MILES) SIMULATOR SYSTEM, FIRING, LASER: M74 NSN 1265-01-159-0485 FOR STINGER WEAPON SYSTEM (1987) TM 9-2330-357-14&P TECHNICAL MANUAL OPERATOR'S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS) FOR SEMITRAILER, FLATBED: RADAR SET AND LAUNCHING STATION M860A1 (NSN 2330-01-117-3280) (1993)

The Other End of the Spear

The Other End of the Spear PDF

Author: John J. Mcgrath

Publisher: Lulu.com

Published: 2011-09-16

Total Pages: 121

ISBN-13: 1105056155

DOWNLOAD EBOOK →

This book looks at several troop categories based on primary function and analyzes the ratio between these categories to develop a general historical ratio. This ratio is called the Tooth-to-Tail Ratio. McGrath's study finds that this ratio, among types of deployed US forces, has steadily declined since World War II, just as the nature of warfare itself has changed. At the same time, the percentage of deployed forces devoted to logistics functions and to base and life support functions have increased, especially with the advent of the large-scale of use of civilian contractors. This work provides a unique analysis of the size and composition of military forces as found in historical patterns. Extensively illustrated with charts, diagrams, and tables. (Originally published by the Combat Studies Institute Press)