The technical, economic, environmental and institutional feasibility of increasing the power generation capacity of the City of Spokane's Upriver Dam Complex by installing additional generating facilities and/or modifying existing facilities were studied. It is proposed that the existing powerhouse be uprated from 3.9 to 4.5 MW and that a new powerhouse be constructed with two 4.5 MW turbines to provide an annual additional energy production of 62.3 million kWh. No adverse environmental or safety effects are foreseen, the socio-institutional impacts will be beneficial, there is a market for the power produced, and the benefit/cost ratio is advantageous. (LCL).