" AOC's CPP heats and cools 25 buildings in the complex, including the Capitol and House and Senate office buildings. CPP does not have the infrastructure to distribute electricity to the buildings it serves. CPP buys fossil fuels (mostly natural gas) to run boilers that make steam and buys electricity to run chillers that make chilled water. CPP distributes the steam and chilled water for heating and cooling using a network of tunnels. AOC seeks to install a 'cogeneration' system that would produce steam and electricity. The House of Representatives report accompanying the Legislative Branch Appropriations Bill, 2014 included a provision for GAO to analyze potential cost savings at CPP. GAO analyzed (1) measures AOC implemented since 2008 to manage the energy-related costs of the complex and opportunities, if any, to further manage these costs, and (2) how AOC decided to procure a cogeneration system and the extent to which AOC followed leading capitalplanning practices. GAO analyzed AOC budgets and plans; reviewed federal guidance on capital planning; and interviewed AOC staff and other stakeholders, including other heating and cooling plant operators. "

Capitol Power Plant Architect of the Capitol Should Update Its Long-term Energy Plan Before Committing to Major Energy Projects

Capitol Power Plant Architect of the Capitol Should Update Its Long-term Energy Plan Before Committing to Major Energy Projects PDF

Author: U.s. Government Accountability Office

Publisher: Createspace Independent Publishing Platform

Published: 2017-03-06

Total Pages: 78

ISBN-13: 9781544221946

DOWNLOAD EBOOK →

AOC's CPP heats and cools 25 buildings in the complex, including the Capitol and House and Senate office buildings. CPP does not have the infrastructure to distribute electricity to the buildings it serves. CPP buys fossil fuels (mostly natural gas) to run boilers that make steam and buys electricity to run chillers that make chilled water. CPP distributes the steam and chilled water for heating and cooling using a network of tunnels. AOC seeks to install a 'cogeneration' system that would produce steam and electricity. The House of Representatives report accompanying the Legislative Branch Appropriations Bill, 2014 included a provision for GAO to analyze potential cost savings at CPP. GAO analyzed (1) measures AOC implemented since 2008 to manage the energy-related costs of the complex and opportunities, if any, to further manage these costs, and (2) how AOC decided to procure a cogeneration system and the extent to which AOC followed leading capitalplanning practices. GAO analyzed AOC budgets and plans; reviewed federal guidance on capital planning; and interviewed AOC staff and other stakeholders, including other heating and cooling plant operators.

Architect of the Capitol: Progress in Improving Energy Efficiency and Options for Decreasing Greenhouse Gas Emissions

Architect of the Capitol: Progress in Improving Energy Efficiency and Options for Decreasing Greenhouse Gas Emissions PDF

Author: Terrell G. Dorn

Publisher: DIANE Publishing

Published: 2009-02

Total Pages: 15

ISBN-13: 143790680X

DOWNLOAD EBOOK →

In April 2007, it was reported that 96% of the greenhouse gas emissions from the Capitol Hill Complex facilities -- managed by the Architect of the Capitol (AOC) -- resulted from electricity use and combustion of fossil fuels. It was recommended that AOC and the other agencies establish a schedule for conducting energy audits and implement selected projects as part of an overall plan that considers cost-effectiveness, the extent to which the projects reduce emissions, and funding options. This statement focuses on: (1) the status of AOC¿s efforts to implement the recommendations in the April 2007 report; and (2) opportunities for the Senate to decrease greenhouse gas emissions and associated environmental impacts. Tables.

Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant

Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant PDF

Author: National Research Council

Publisher: National Academies Press

Published: 2009-09-12

Total Pages: 48

ISBN-13: 0309142024

DOWNLOAD EBOOK →

The U.S. Capitol Complex in Washington, D.C., comprises some of the most historic and symbolic buildings in the nation. The steam and chilled water required to heat and cool these buildings and related equipment is generated and distributed by the Capitol Power Plant (CPP) district energy system. Portions of the CPP system are now 50 to 100 years old and require renewal so that reliable utility services can be provided to the U.S. Capitol Complex for the foreseeable future. Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant provides comments on an interim set of publicly available consultant-generated options for the delivery of utility services to the U.S. Capitol Complex. The report provides recommendations to bring the interim options to completion, including suggestions for additional analyses, so that the CPP can be best positioned to meet the future strategic and energy efficiency requirements of the U.S. Capitol Complex.

Bulletin of the Atomic Scientists

Bulletin of the Atomic Scientists PDF

Author:

Publisher:

Published: 1970-06

Total Pages: 116

ISBN-13:

DOWNLOAD EBOOK →

The Bulletin of the Atomic Scientists is the premier public resource on scientific and technological developments that impact global security. Founded by Manhattan Project Scientists, the Bulletin's iconic "Doomsday Clock" stimulates solutions for a safer world.